Case Study: Connahs Quay

3G Artificial Turf Pitch for Football

Based at the Deeside Stadium, Connah’s Quay Nomads’ first team plays in the Welsh Premier League and wanted to provide a new 3G football turf pitch for their very successful Academy.

In just the first two months following completion, some 5000 players had the opportunity to play on the new facility, located at Connah’s Quay High School, which along with the local community, also use the pitch.

An existing sand-filled artificial grass hockey pitch was removed and the surfacing footprint extended to accommodate a larger 3G football turf pitch. 42mm FieldTurf 360XL installed over an in-situ bound rubber shock pad was selected as the playing system. A new pitch sub-base was constructed complete with lateral drainage system and supplemented by new perimeter fencing and upgraded floodlighting.

Facility

3G Artificial Turf for Football. 7420m2

FIFA 1-Star Performance Standard.

Designed to allow hockey and touch-rugby also to be played.

Inlaid football pitch markings, team shelters and pitch equipment, access footpath and hardstandings, mini-tractor and equipment for maintaining the pitch.

S&C Slatter, undertook this challenging project in a difficult live school environment in a professional and safe manner. They delivered a high quality facility which been very well received by the club, school and local community. The service provided by their site staff and management team has to be commended.

Jonathan Smith BSc (Hons) MSc CBIOL MIBIOL MCIWEM, Geo Turf Consulting, Project Consultants