Case Study: Eastbourne Borough FC

3G Artificial Turf Pitch for Football

Work to convert the natural grass pitch at Eastbourne Borough’s Priory Lane stadium to 3G football turf started early in May 2016 and was completed by mid-July ready for the club’s new season in the National League South.

The FIFA 2-Star Performance Standard artifcial pitch has a premium 42mm Vertex RGF 3G football turf manufactured by FieldTurf. Underneath the surface is an in-situ bound e-layer performance base installed over a fully engineered sub-base. In addition to the construction works and surfacing installation, S&C Slatter provided all the pitch sports equipment and pitch maintenance machinery.

The new pitch facility has enabled Eastbourne Borough to expand its already successful academy and development centre programmes and secure a long term agreement with national 5 and 6 a side league operator Soccersixes.

Facility

3G Artificial Turf Pitch for Football. 8251m2.

FIFA 2-Star Performance Standard.

New build engineered sub-base construction with lateral drainage system.

Complete with in-laid line markings, pitch and maintenance equipment.

Annual specialist after care contract.

We are delighted with the end product. It looks magnificent and plays totally true – our playing and coaching staff are entirely positive about the surface. We identified S & C Slatter as our preferred pitch supplier some time ago and they have worked closely with us throughout our planning process. They have been utterly professional and delivered on time and on budget. I cannot praise them highly enough.

Paul Maynard, Chairman, Eastbourne Borough FC

For more information call 01635 34521 or email enquiries@slattersportsconstruction.com